Cost to Replace Pecky Cedar Boards With Knotty Pine

Submitted by: rseekerr – lake arrowhead, CA USA

Removal of pecky cedar boards-80sqft of wall space insulate and replacement w- knotty pine 11 inch vertical placement. Removal and disposal of the old boards. Move a non-loadbearing 8ft wall.

Comments

  1. This would probably be 2-3 days work. The job size exceeds the limits for an unlicensed handyman in California. Check the local codes for legal requirements.

What would a fair price be?